§12.2 · CAPABILITY · 4 MIN READ · EDITION 1.0
Sixty to ninety days: from pilot to decision
The second phase turns the first month's measured use case into a qualification decision: pilot, restrict, improve, or stop, each with a documented reason.
By day sixty, the reference set, acceptance criteria and pilot results should exist in writing; a verbal sense that "it's going well" is not a decision record.
Use this window to also test the reviewer workflow itself, not only the model: is verification actually faster than production, and does the interface support honest rejection?
PUT THIS INTO PRACTICE
- 01Document the qualification decision and its reasoning.
- 02Test the reviewer workflow, not only the model output.
- 03Set the next review date before closing this phase.
RELATED INSTRUMENTS
CITE THIS SECTION
§12.2 · Edition 1.0 · Sixty to ninety days: from pilot to decision